References

ENGINEERING REFERENCES

Date: 2016

Customer: Şişecam Kimyasallar Soda Sanayi A.Ş.

Scope of Work: Within the scope of Fluidized Bed Boiler Project, 19 venturi tube designs and production for air and gas line flow measurement

Date: 2016

Customer: Kolin İnşaat A.Ş.

Scope of Work: Design and production of 6 emergency discharge line pressure reducing (restriction) orifices

Date: 2016

Customer: Aselsan A.Ş.

Scope of Work: Re-design, analysis and tests of LHD radar cooling plates formerly produced by Al-Brazing method according to FSW (Friction Stir Welding) method 

Date: 2017

Customer: Esgaz Doğalgaz Dağıtım A.Ş.

Scope of Work: 6″ (DN150) Flowmeter (1 unit) to be used in City Domestic Regulators 

Venturi Tube Flow Device - Wadi Arab Project - C-Flow Instruments

Date: 2019

Customer: Yeo Elektrik Otomasyon A.Ş. (Mapa İnşaat)

Scope of Work: Design and production of 1 set of Venturi Tube flow meter flow element for measuring blower line air flow for use in Jordan Wadi Arab Water Treatment plant project

ısı kontrol birimiDate: 2019

Customer: Aselsan A.Ş.

Scope of Work: Design and production of automatic heat control unit with 2kW heat discharge capacity, 1.5 - 12 LPM flow rate and adjustable temperature range of 15 - 60 ° C. 

orifice plate 44inchDate: 2019

Customer: Yokogawa Turkey

Scope of Work: Design and manufacture of orifice plate for flow measurement on 44 ″ diameter COG (Coke Oven Gas) line

orifice plate boxDate: 2019

Customer: Fokus Proses

Scope of Work: Production of orifice plate with DN40 diameter (2 pieces)

CONTRACTING REFERENCES

Taahhüt - Türbin MontajıDate: 2014

Customer: Efor Endüstriyel A.Ş.

Scope of Work: 2 units of Skoda Steam Turbine, Siemens Generator and auxiliary equipment with 2x145 MW capacity within the scope of Yunus Emre Thermal Power Plant project

taahhüt - yardımcı kazanDate: 2015

Customer: Efor Endüstriyel A.Ş.

Scope of Work: Within the scope of Yunus Emre Thermal Power Plant project, 10 t / h capacity auxiliary boiler and Fuel Oil Feed System installation, commissioning and performance tests

Taahhüt - konveyör sistemiDate: 2016

Customer: Efor Endüstriyel A.Ş.

Scope of Work: Within the scope of Mersin Soda 320 t / h Fluidized Bed Steam Boiler project, coal stock hall equipment and 200 meter bridge and belt conveyor system installation and commissioning

Taahhüt - kazanDate: 2016

Customer: Efor Endüstriyel A.Ş.

Scope of Work: Within the scope of Mersin Soda 320 t / h Fluidized Bed Steam Boiler Project, installation of fluidised boiler pressurized parts and piping

Taahhüt - RAPH montajı

Date: 2017

Customer: Efor Endüstriyel A.Ş.

Scope of Work: Within the scope of Soma Kolin Thermal Power Plant project, installation of 2 units of rotary air preheaters (RAPH)

en_USEnglish